Nepal Disaster Update Live coverage

Live coverage

Rasuwa flood: damage assessment

What was destroyed, project by project and category by category, and which numbers are preliminary, which is all of them.

Two separate money figures, never added together

Rs 200 billion is the preliminary estimate of damage to roads and bridges. Rs 1 billion is the relief money released by the government. They measure opposite things and are kept apart everywhere on this site.

Hydropower: 14 projects, about 748 MW

Nepal’s Bhote Koshi-Trishuli corridor carries a concentration of hydropower capacity, sited on the riverbank because that is where the water and the flat ground are. The Nepal Electricity Authority reports 14 projects damaged with a combined capacity of about 748 MW: 9 operating plants totalling 354 MW, and 5 under construction totalling 394 MW.

An earlier estimate the same day, from the Ministry of Energy, put the loss at 431 MW. Both figures were published on 27 August. That gap is a fair measure of how provisional every damage number on this page is.

Named projects from the Nepal Electricity Authority via the UN OCHA situation overview, 27 August, and reporting by The Kathmandu Post. The NEA count of 14 projects includes further sites it has not individually named.
ProjectDistrictWhat is reported
Rasuwagadhi Hydropower ProjectRasuwaDamaged. Sits on the Bhote Koshi immediately below the border crossing.
Chilime HydropowerRasuwaDamaged. One of the country’s better-known community-shareholder projects.
Sanjen Khola HydropowerRasuwaDamaged, on a Bhote Koshi tributary.
Upper Trishuli-1Rasuwa / NuwakotDamaged. One of the largest projects on the corridor.
Upper Trishuli-3B substationNuwakot220 kV substation damaged, which affects evacuation of power from the whole corridor. Twelve project staff were reported out of contact.
Trishuli Hydropower StationNuwakotDamaged. One of Nepal’s oldest operating stations.
Devighat Hydropower StationNuwakotDamaged. The furthest downstream site where damage has been reported.

Roads and bridges

The Department of Roads confirms that the entire 42 km road linking Betrawati in Nuwakot to the Rasuwagadhi border crossing has been destroyed at multiple points, including several concrete bridges. A further 16 km stretch toward the border, recently upgraded with Chinese government financing, was also swept away.

That is not one road among many. It is Nepal’s principal overland trade and pilgrimage route to Tibet, so the damage has an economic tail well beyond the district. It is also the same road rescue teams need to reach the worst-hit settlements, which is why so much of the response has had to go by helicopter.

Suspension (jhulunge) bridges lost in the corridor matter more than the count suggests: in hill districts they are frequently the only way across a river for a village, so losing one cuts a settlement off entirely rather than lengthening a drive.

Buildings and services

  • 9 commercial bank branches swept away, with 26 staff unaccounted for.
  • The Rasuwa customs office at Timure lost contact with 15 employees.
  • The Syabrubesi helipad destroyed, which slowed rescue flights into the upper valley on the first day.
  • Power, phone and internet down across the valley, restored slowly and unevenly. This is the direct reason the missing-persons count is as high as it is.
  • Dry port and customs facilities hit on both sides of the Rasuwagadhi-Gyirong crossing.
  • Most river gauges destroyed on the Bhote Koshi and Trishuli, cutting warning time for anything that follows.
  • No consolidated displacement figure has been published. UN OCHA names the number of people displaced, sheltering or in need as the priority information gap for the days ahead. This site will not estimate it.

The cost estimate, and what it does not include

Physical Infrastructure and Transport Minister Sunil Lamsal put damage to roads and bridges at about Rs 200 billion on 26 August, and described the figure as preliminary. It is a first-day estimate from one ministry covering one category of asset.

Not in that figure:

  • The 14 damaged hydropower projects, and about 748 MW of lost generation while they are out.
  • Private homes, shops, hotels and land.
  • Agricultural losses downstream.
  • Trade losses from the closed border route.

No full damage assessment exists yet. Rasuwa, Nuwakot, Dhading and Chitwan are still being surveyed, and many of the damaged sites cannot currently be reached by road, which is also why insurers say claims will take weeks to settle.

Relief money released

Government of Nepal, announced 26 August 2026. Public donations are not counted here until an official total is published.
RecipientAmount
Central disaster relief fundRs 1 billion
Rasuwa districtRs 10 million
Nuwakot districtRs 10 million
Dhading districtRs 5 million

How to contribute to the government relief fund safely, including the official bank accounts and QR code.

Sources